Unreasonable Group contacted us as they wanted to live stream their 2017 Impact World Forum in London. We had previously worked with them on a similar event at the Royal Institution in London. We provided a complete outside broadcast solution including five cameras, three Camera Operators, Director, Vision Mix Operator, Live Stream Engineer and a manned time delay unit. Barclays wished to add a broadcast delay so we brought in a delay unit to handle this. CBS News also wanted